EAST DAM TOE DRAIN EXTENSION

Partner

Copper Mountain Mine

Project Manager

Brook Webster

Project Manager Contact

bwebster@arrow.ca, (250) 571-6085

Location

Copper Mountain Mine

Completion date

August 2022

Project Award Date

July 2022

Project Details

Construction of a toe drain at the north end of the East Dam at Copper Mountain Mine. Install and maintain a dam seepage diversion for the duration of construction (24/7 for 1 month). Excavate to embankment while design grades for drain construction. Haul and place backfill using various methods and material types in layers to the desired design limits.

Project Services and Scope

  • Excavation of trench to design elevation.
  • Backfill of trench to designed elevation with different types of aggregates in layers.
  • By-pass pumping and water management.
  • Managing all environmental plans and keeping in compliance with the environmental management plans set out by CMM.
  • Managing survey for this project including supply of as-builts.
  • Staying within all safety guidelines set out by CMM.
  • Supplying turnover packages during the course and after the work scope has been completed.
  • Supply trucks for the aggregate haul from to job site.