EAST SHUSWAP ROAD

Partner

Argo Roads for the Ministry of Transportation & Infrastructure

Project Manager

Brook Webster

Project Manager Contact

bwebster@arrow.ca, (250) 571-6085

Location

Kamloops, BC

Completion date

November 9, 2020

Project Award Date

October 1, 2020

Project Details

The South Thompson River eroded a 300-meter section of East Shuswap Road, making the road unstable. Argo reduced the section of road to single lane traffic until a solution could be found to make it safe for the traveling public. Arrowhead was contracted to move the alignment of the road away from the unstable embankment.

Project Services and Scope

Project services Arrowhead provided include:

  • clearing and grubbing of trees and light brush
  • stripping of organic materials
  • removal of existing asphalt
  • earthworks for the new road alignment
  • placement of granular road structure
  • placement of asphalt
  • installation of Concrete Roadside Barrier (CRB)
  • line painting