Highway Infrastructure

Complexity Level 4 – Post-Flood Corridor Reconstruction Works

Construction along Highway 8 near Spences Bridge has required extensive, carefully coordinated work to rebuild the corridor after the devastating 2021 atmospheric river washed out large sections of the road and surrounding infrastructure. Permanent repairs involve reconstructing road embankments, restoring washed‑out highway segments, and completing in‑river work to stabilize the corridor and improve long‑term climate resilience.

SERVICES AND SCOPE

  • Type D Excavation and Disposal
  • Drainage Improvements
  • Removal of existing high fines surfacing aggregate (HFSA)
  • Ditch lining with HFSA
  • Installation of Corrugated Steel Pipe
  • Culvert Endwall Construction with Rubber Check Valve
  • Production and Placement of 25 mm Well Graded Base (WGB)
  • Production of Paving Aggregates
  • Bottom and Top Lift Paving
  • Placement of Shoulder Aggregate
  • Remove, Stockpile and Replace and/or Install new Concrete Roadside Barrier (CRB)
  • Removal and Disposal and/or Relocation of Existing Signs and Delineators
  • Supply and placement of Class 1000 kg Ripap in accordance with the gradation shown on the Drawings for revetment, including but not limited to, construction of spurs.
  • Supply and placement of large wood with rootwad as part of the riprap spurs.
  • Supply and installation of signs
  • Revegetation seeding
  • Excavation and placement of granular materials adjacent to active local and construction traffic
  • Work adjacent to and within the Nicola River

INDIGENOUS PARTICIPATION

Project completed with the full support, endorsement and in partnership with Shackan Indian Band

PROJECT VALUE

$4,700,000.00

SERVICES AND SCOPE

  • Removal, temporary stockpiling, and reinstatement of concrete roadside barriers.
  • Construction of a temporary access road from Highway 8 to/from the Nicola River.
  • Supply and placement of Class 1000 kg Ripap in accordance with the gradation shown on the Drawings for revetment, including but not limited to, augmentation of existing riprap and granular filter layer.
  • Supply and placement of large wood with rootwad.
  • Supply and installation of topsoil, hydraulic mulch, biotic soil amendment, and revegetation seeding

The Work involves most common aspects of highway construction, as well as, without limitation, the following complex or unusually aspects:

  • Construction of a temporary access road to facilitate revetment work in the Nicola River.
  • Work adjacent to and within the Nicola River

INDIGENOUS PARTICIPATION

Project completed with the full support, endorsement and in partnership with  Nooaitch Indian Band

PROJECT VALUE

$2,000,000.00

PARTNERS
Ministry of Transportation and Transit

COMPLEXITY LEVEL 4
Advanced / High Complexity

PROJECT CONTACT
Garrett Blom
garrett.blom@arrow.ca
(250) 571-1940

PROJECT DATES
March – August 2025