Site Development

Complexity Level 4 – Preloading, Deep Utilities, and Site Grading

Arrow Project Services is supporting the multi‑phase development of the Chief Louis Crossing Commercial Complex with a full suite of civil construction services. Phase I included pre‑loading future building footprints, installing deep utilities, hauling and placing backfill, and completing excavation work in coordination with archaeological teams. The team also handled foundation excavation, sub‑grade preparation, base gravel installation, and final grading for curb and asphalt work. With Phases II and III underway, Arrow continues to deliver safe, reliable, and community‑focused construction services for Tk’emlúps te Secwépemc.

Pre-load building footprints for future construction. Installation of all deep utilities , haul and place backfill using various methods and material types in layers to the desired design limits. Excavation of native material while working closely with the archaeological team.

SERVICES AND SCOPE

  • Excavation of foundations to design elevations
  • Sug grade preparation and base gravel installation
  • Sanitary sewer, storm sewer and watermain installation and commissioning
  • Final grade preparation of curb and asphalt installation
  • Excavation, segregation, and stockpiling of Archeological materials as directed
INDIGENOUS PARTICIPATION

Project completed with the full support and endorsement of Tk̓emlúps te Secwépemc

PROJECT VALUE

$2,500,000.00 (Value of Phase I – II)

PARTNERS
Vision Quest Advisors Inc.
Tk’emlups te Secwepemc

COMPLEXITY LEVEL 4
Advanced / High Complexity

PROJECT MANAGER
Kurt Deneault
kdeneault@arrow.ca
(250) 819-2815

PROJECT DATES
PHASE I
August 2023- September 2024

PHASE II
August 2023 – Fall 2025

PHASE III
August 2023 – TBA