Technical Complexity and Scale Rating System 1 - 5

Arrow Project Services uses a Technical Complexity and Scale Rating System to bring greater clarity, consistency, and confidence to project planning. This framework helps teams assess the unique challenges, risks, and resource needs of each project—ensuring the right approach, expertise, and support are in place from the start.

By aligning project scale with technical complexity, we deliver smarter decisions, stronger outcomes, and successful execution across all project types.

Level 1

Limited Scope
  • Typically <$250,000
  • Straightforward construction or demolition activities
  • Minimal environmental or safety constraints
  • Single-discipline scope
  • Low coordination requirements
  • Typical work: small earthworks, basic demolition, minor utility work

Level 2

Standard
  • Typically $250,000 – $1,000,000
  • Conventional construction methods
  • Some traffic, utility, or environmental controls
  • Limited interfaces with third parties
  • Predictable sequencing
  • Typical work: small road realignments, standard culverts, simple remediation

Level 3

Intermediate / Complex
  • Typically $1,000,000 – $3,000,000
  • Multiple integrated scopes
  • Active environments (traffic, water, operations)
  • Temporary works such as bypass pumping or detours
  • Formal survey, QA/QC, and environmental monitoring
  • Typical work: channel works, watermain upgrades, moderate bridge or highway projects

Level 4

Advanced / High Complexity
  • Typically $3,000,000 – $7,000,000
  • High-risk or high-consequence work
  • Staged construction with strict sequencing
  • Environmental timing windows
  • Significant coordination with stakeholders and Indigenous partners
  • Typical work: major river works, dam toe drains, bridge replacements, corridor reconstruction

Level 5

Critical / Program Level
  • Typically $7,000,000+
  • 24/7 or uninterrupted operations
  • Extensive redundancy planning
  • Long-duration projects with overlapping scopes
  • Highest safety, environmental, and operational scrutiny